The store is ready. The crew is ready. Is the freight?
A missed delivery idles a crew, adds cost and puts the reopen date at risk. Graham protects the remodel schedule your freight is supposed to support.
300 stores. 300 deadlines. One accountable transportation plan.

Over 99%
on time
Under 1%
claims
60¢
saved per dollar vs. the previous program
Long-run program history. Delivered through CRST Specialized, which Graham represents as an authorized agent.
One missed delivery costs more than the freight.
The crew is booked. The store is closed for the night. The cases don't arrive.
On one program Graham runs, the mechanical contractor bills for the crew's time whether the cases show up or not.
Then the costs stack up:
- An idle crew, billed anyway
- Added cost to recover the night
- A delayed remodel
- A reopening date at risk
Receive. Inspect. Hold. Deliver.
You're buying certainty that the date holds. Transportation is how we deliver it.


- 01
Receive
Equipment reaches the warehouse well ahead of the install.
- 02
Inspect
Damage is found and claimed here, not at the store.
Over 15%of inbound freight from other carriers found with claims before install
- 03
Hold
Nothing ships until the store is ready for it.
- 04
Deliver
After hours, on the crew's schedule, in install order.
Store reopens on schedule.
We represent CRST Specialized, an asset-based carrier. As an authorized CRST agent, we build programs around their fleet, network and warehouses. CRST delivers and coordinates the freight. Your installer installs.
Where remodel schedules break
Damage found at install
At installation, it's too late.
The turnover date moved
The freight is already on the road.
Fixtures out of sequence
The crew can't install what arrived first.
No one on site to receive
The truck is on time. Nobody's there to sign.
The reopen date is at risk
One late store pushes the next one in the wave.
Your team already runs rollouts. Keep what works.
Maybe you warehouse it yourself. Maybe vendors ship direct to each store. Graham works alongside that setup and adds a checkpoint between the warehouse and the store, so a damaged case or a moved date gets caught before the crew is standing there.
Start with one region, one wave or one equipment type.

Frequently asked questions
Does Graham install the equipment?
No. CRST Specialized, the carrier Graham represents as an authorized agent, delivers and coordinates the freight. Your installer or mechanical contractor installs. Graham's job is to get the right equipment to the right store, intact, on the night the crew is booked.
Can deliveries happen after hours?
Yes, where the program calls for it. On the refrigeration program, cases arrive after hours on the crew's schedule, because the install happens while the store is closed. The remodel plan sets the window, not the carrier's routes.
What happens if equipment arrives damaged?
It's found in the warehouse, not at the store. Graham receives equipment well ahead of the install and inspects it on arrival. If freight is lost or damaged, we stay with you through the claim.
We already run our own warehouse. Why change?
You may not need to. Graham can work alongside what you run today. A first engagement can be one region, one wave or one equipment type, scoped in detail before the first load moves.
Let's talk about your rollout.
Tell us how many stores are in the next wave, when installs start and what worries you most. We'll get back to you within 2 hours during business hours, 8 a.m. to 5 p.m. Central.
Not ready to talk? Read the refrigeration program story.
