Tools · Late Delivery Cost Calculator

What does one missed delivery cost you?

A delivery that shows up late, damaged, incomplete or in the wrong place stops the work the same way. Enter your own numbers. The answer updates as you type, with every assumption visible.

  1. Ready to ship

  2. Release

  3. Transport

  4. Delivery missed

  5. Crew waiting

  6. Ready to install

Installation tools and a ladder wait in an empty retail aisle before a scheduled freight delivery
01

Your deliveries

Shipments where a miss stops a crew, an install or an opening.
Share of critical shipments that arrived intact, complete, correctly placed and before the crew or event needed them. Stricter than carrier on-time delivery.
02

Cost of one miss

Only enter costs not already counted in another line. If several late shipments share one disruption, split its cost across them so it's counted once.

Daily costs below are prorated on an 8-hour day.
Wages plus burden, travel and per diem.
Crane, lift, rigging, electrician, GC standby.
Enter lost contribution margin: revenue permanently lost minus costs avoided. Leave out revenue that's only delayed.

Sets the best and stress cases. The base number is always what you entered.

03

Example numbers. Replace them with yours.

Your result

One reliability point is worth

$59,920/ year

or $300 per critical shipment

One point means moving from 97% to 98% install-ready delivery across 200 critical shipments. The per-shipment figure is the most extra freight cost that improvement can justify. Best to stress case: $41,944 to $89,880.

Cost of one miss

$29,960

Best $20,972 · Stress $44,940

Expected loss per shipment

$899

Best $629 · Stress $1,348

Expected annual loss

$179,760

Best $125,832 · Stress $269,640

Expected misses per year

6

At your current rate

Each critical shipment carries about $899 of expected loss on top of its $2,400 freight bill. These costs aren't in the freight rate.

One miss, broken down

Crew idled$8,160
Equipment and contractors$4,500
Lost production or revenue$10,000
Rescheduling$2,500
Expedited recovery$1,800
Penalties$3,000

What better execution is worth

GainPer yearPer shipment
+0.5 pts$29,960$150
+1 pt$59,920$300
+2 pts$119,840$599
+3 pts$179,760$899

Per shipment is the most extra freight cost that gain can justify before it stops paying for itself.

Illustrative. Not a Graham performance forecast.

Show the assumptions
  • A miss disrupts 8 hours (1 of an 8-hour day). Daily costs are prorated to that.
  • 12 people idled at $85/hr.
  • Cost of a miss is built only from the parts entered. No separate all-in delay cost is added.
  • Install-ready delivery rate: 97%, so 3% of critical shipments miss.
  • Reliability is held at your rate in every case. Only the cost of a miss varies.
  • The value of one reliability point depends only on the cost of a miss and volume, not on your current rate.
  • Cost of a miss varies -30% / +50% around your number, based on how sure you are of it.
  • 200 critical shipments per year.

Graham Logistics Services is a licensed freight broker, an authorized agent for CRST Specialized, and a brokerage agent for GlobalTranz. This calculator estimates economics from the numbers you enter. It's a planning tool, not a quote, a guarantee of any outcome, or a Graham performance forecast.

Visibility shows you the fire sooner. We put it out.

Graham protects the critical path between ready to ship and ready to install. We help catch problems before they reach the site, and one accountable team sits across CRST Specialized, GlobalTranz and Graham's own brokerage.

How our role works on each platform

Frequently asked questions

What counts as a missed delivery?

Any critical shipment that didn't arrive intact, complete, correctly placed and before the crew or event needed it. A truck that's on time with damaged or missing freight still stops the work, so it counts.

Why is one reliability point worth so much?

Because each point is 1% of your critical shipments that no longer miss. The value is the cost of one miss times 1% of your annual volume. It depends on the cost of a miss and how many critical shipments you run, not on your current rate.

Does Graham cover the cost of a miss?

No. The calculator measures your exposure so you can decide what reliability is worth. If freight is lost or damaged, we stay with you through the claim.

Is my data saved?

No. The numbers stay in your browser. They're only sent if you choose to include the estimate in a talk request.

Bring the number to a conversation.

Tell us about the project and what worries you most. Your estimate comes with the request, so the first conversation starts with your numbers. We'll get back to you within 2 hours during business hours, 8 a.m. to 5 p.m. Central.

Your estimate, included with the request

LATE DELIVERY COST: Store opening or remodel
200 critical shipments per year · $2,400 freight per shipment

1. Cost of one miss: $29,960 (best $20,972, stress $44,940)
2. Expected loss per critical shipment: $899 (best $629, stress $1,348)
3. Expected annual loss: $179,760 (best $125,832, stress $269,640)
4. Value of one reliability point: $59,920 per year, or $300 per critical shipment (best $41,944, stress $89,880)

Cost of one miss, broken down:
- Crew idled: $8,160
- Equipment and contractors: $4,500
- Lost production or revenue: $10,000
- Rescheduling: $2,500
- Expedited recovery: $1,800
- Penalties: $3,000

Assumptions:
- A miss disrupts 8 hours (1 of an 8-hour day). Daily costs are prorated to that.
- 12 people idled at $85/hr.
- Cost of a miss is built only from the parts entered. No separate all-in delay cost is added.
- Install-ready delivery rate: 97%, so 3% of critical shipments miss.
- Reliability is held at your rate in every case. Only the cost of a miss varies.
- The value of one reliability point depends only on the cost of a miss and volume, not on your current rate.
- Cost of a miss varies -30% / +50% around your number, based on how sure you are of it.
- 200 critical shipments per year.

Calculated with the Graham Logistics Services Late Delivery Cost Calculator.