The server isn't delivered when it reaches the dock.
A late, damaged or incomplete order stalls the install, and commissioning slips with it. Graham protects the build schedule your equipment is supposed to support.

Two hyperscalers, each with its own build rules
Tracked to the box, so the customer sees what's missing
Complete orders, delivered just in time, including white-glove inside delivery
Live and growing
Warehousing and order assembly through CRST Specialized, which Graham represents as an authorized agent. Freight through GlobalTranz, for which Graham is a brokerage agent.
One missing component can stall the whole install.
The racks are on site. The install team is booked. One piece of the order didn't come with it.
Then the costs stack up:
- An install team waiting on one part
- An install sequence that can't move ahead
- Commissioning that slips
- Revenue from the build that starts later
Time-to-energization is a logistics number wearing a construction costume.
What would one incomplete order cost you? Run the numbersReceive. Track. Assemble. Deliver.
You're buying certainty that the build holds its dates. Transportation is how we deliver it.

- 01
Receive
Sourced material comes into the warehouse ahead of the build.
- 02
Track
Every order is tracked to the box, so what's missing shows up before the truck leaves.
- 03
Assemble
Every component of the order comes together, on a pallet unit of measure where that cuts handling.
- 04
Deliver
Just in time to the site, including white-glove inside delivery.
Install starts on schedule.
We represent CRST Specialized, an asset-based carrier. As an authorized CRST agent, we build programs around their fleet, network and warehouses. Through our GlobalTranz relationship, we offer managed transportation and enterprise brokerage. Graham tells you which platform each shipment runs on, and you have one contact across both.
Where data center builds break
A populated rack damaged in transit
Found at the data hall, it's too late.
A partial shipment
Half an order can't be installed.
Equipment early or late for the window
Early means storage risk. Late means a waiting crew.
Site access changed after dispatch
The truck is on time. It can't get through the gate.
The crane window was missed
Miss the lift and wait for the next one.
Two sides of the same schedule.
- Supplying the equipment. OEMs, integrators and resellers who have to ship complete orders to sites with different rules.
- Building the site. GCs, EPCs and the coordinators between them, who need equipment to arrive in the order and window the schedule calls for.
Either way, the question is the same: when something doesn't arrive the day the project needs it, whose budget takes the hit?
Your team already runs deployments. Keep what works.
Keep your integrator, your site logistics plan and the carriers you use now. Graham works alongside that setup and adds a checkpoint before the site, so a missing box or a moved date gets caught before the install team is standing there.
Start with one build, one site or one product line.

Frequently asked questions
Does Graham configure or install the equipment?
No. Your team or integrator configures it, and your installer installs it. Graham gets the complete order to the site intact, in the window the install needs. On the rack program, CRST Specialized warehouses the material, assembles every component of each order and delivers it just in time.
Can you see what's missing before it ships?
On the rack program, yes. Material is tracked to the box level through CRST Specialized, so the customer can see what's missing from an order before it's delivered, not after the crew opens it.
Can one program handle end customers with different rules?
Yes. On the rack program, one hyperscaler wants the build kept in the United States and the other accepts configuring across the border and shipping north. The same product runs on two logistics designs.
Do I deal with two companies?
You get one Graham contact. Each platform has its own agreement and its own invoice, so a program that uses both CRST Specialized and GlobalTranz has two agreements and two invoices. Graham tells you which platform each shipment runs on: CRST Specialized for warehousing, assembly and white-glove delivery, GlobalTranz for freight.
Do we have to move our whole program?
No. Graham can work alongside what you run today. A first engagement can be one build, one site or one product line, scoped in detail before the first load moves.
Let's talk about your build.
Tell us what you're building or supplying, when the equipment needs to land and what worries you most. We'll get back to you within 2 hours during business hours, 8 a.m. to 5 p.m. Central.
Not ready to talk? Read the rack program story.