Medical equipment

The machine isn't delivered until it's where the customer needs it.

Imaging and other high-value medical equipment comes with a booked install team, a finished room and a go-live date. Graham plans each delivery around the install date and helps catch problems, like a room that isn't ready, before the truck leaves.

Two workers guide a framed medical imaging unit on a pallet jack through a hospital corridor, one checking a tablet
Delivered through CRST Specialized

White-glove, high-value delivery

Pad-wrapped, with liftgate and inside delivery where the site needs it

Delivery appointments set to the site's receiving window

Equipment held until the room is ready

Delivered through CRST Specialized, which Graham represents as an authorized agent.

When the equipment misses the install date, everything booked around it moves.

The install team is booked. The room is finished. Patient schedules are built around the day the equipment goes live. When the delivery is late, damaged or can't get to the room, all of it has to be rescheduled.

Then the rest stacks up:

  • An install team rebooked
  • Riggers or lift equipment booked twice
  • A finished room sitting empty
  • A go-live date, and the patient schedule behind it, pushed back
What would one missed install date cost you? Run the numbers

Plan. Hold. Schedule. Deliver.

You're buying certainty that the equipment and the install team meet in the room. Transportation is how we deliver it.

A worker checks a tablet beside protected medical imaging equipment held in a warehouse before delivery
  1. 01

    Plan

    Before anything ships, we work through the room, the path from the dock to the room, the site's receiving hours, rigging and the install date.

  2. 02

    Hold

    Where the program includes storage, the equipment waits in a CRST Specialized warehouse until the room is ready.

  3. 03

    Schedule

    The delivery is set to the receiving window and the install date before it leaves.

  4. 04

    Deliver

    Pad-wrapped and white-glove, with inside delivery where the site needs it.

  5. Install starts on schedule.

We represent CRST Specialized, an asset-based carrier. As an authorized CRST agent, we build programs around their fleet, network and warehouses. CRST delivers and coordinates the freight. Your install team installs.

Your team already runs installs. Keep what works.

Keep your install team, your site surveys and the carriers you use now. Graham works alongside that setup and adds a checkpoint before the delivery, so an unready room or a missing rigging slot gets caught before the equipment is at the door.

Start with one install, one site or one equipment line.

Frequently asked questions

Does Graham install the equipment?

No. Your install team, or the manufacturer's, installs and calibrates it. CRST Specialized, the carrier Graham represents as an authorized agent, delivers and coordinates the freight. Graham's job is to get the equipment where the install team needs it, on the day they're booked.

Can you deliver inside the building?

Yes, where the site needs it. Inside delivery, liftgate and pad wrapping are planned before the truck leaves, along with the path from the dock to the room.

What if the room isn't ready?

Where the program includes storage, the equipment can wait in a CRST Specialized warehouse until it is. That's why room readiness is part of the plan before anything ships.

Do we have to move all our medical freight?

No. Graham can work alongside what you run today. A first engagement can be one install, one site or one equipment line, scoped in detail before the first load moves.

Let's talk about your install.

Tell us what equipment it is, where it's going and when the install is booked. We'll get back to you within 2 hours during business hours, 8 a.m. to 5 p.m. Central.

Not ready to talk? See how Graham works on every platform.