Store Remodel Logistics: How to Keep Every Remodel Night on Schedule
A store remodel runs on booked crews and closed-store nights. How to plan remodel freight so it arrives intact, in install order, on the crew's schedule.
By Graham Logistics Services
A store remodel is planned around nights the store is closed and crews booked for those nights. The fixtures, refrigeration cases and equipment have to be there when the crew is. When they aren't, the night is lost, and in a remodel wave, one lost night pushes the next store.
Most remodel freight problems don't start with the truck. They start with a plan built around when freight is ready to ship, instead of when the crew is ready to install it.
What a missed remodel night costs
On one program Graham runs, the mechanical contractor bills for the crew's time whether the cases show up or not. That's the first cost, and the easiest to see. The rest stack up behind it:
- An idle crew, billed anyway
- Added cost to recover the night
- A delayed remodel
- A reopening date at risk
Across a wave of stores, that adds up fast. And a damaged case found at the store does the same damage as a late one: the crew can't install it, and the night is lost.
Where remodel schedules break
The same few breakpoints show up on most remodel programs:
- Damage found at install. The case looked fine on the truck. The crew opens it and can't use it.
- The turnover date moved. The store isn't ready on the date the plan was built around, and the freight is already on the road.
- Fixtures out of sequence. Everything shows up, but not in the order the crew installs it.
- No one on site to receive. The truck is on time, and nobody's there to sign.
- The reopen date at risk. One late store pushes the next one in the wave.
Only some of these are about the truck. Most are about what happened before it left.
Plan the freight around the remodel, not the carrier
The fix is a checkpoint between the supplier and the store. On remodel programs that hold their dates, freight moves in four steps:
- Receive early. Equipment reaches a warehouse well ahead of the install, so there's time to deal with problems.
- Inspect on arrival. Every piece is checked there. Damage is found and claimed in the warehouse, not at the store.
- Hold until the crew calls it off. Nothing ships until the store is ready for it.
- Deliver on the crew's schedule. After hours where the install needs it, in install order.
The inspection does the most work. Found in the warehouse, a damaged case is a replacement order. Found at the store, it's a lost remodel night.
What this looks like on a real program
For one of the largest retailers in the world, refrigeration cases for store remodels arrive at a warehouse well ahead of each install date. Every case is checked and dispositioned on arrival, and nothing ships until the remodel crew calls it off. Then the cases arrive after hours, on the crew's schedule.
More than 15% of inbound freight from other carriers has been found with claims at the warehouse, in time to be dealt with before the install.
Over the program's history, deliveries have run above 99% on time, with claims under 1%. And the program saved 60 cents of every dollar spent under the previous program.
When the rollout gets bigger
What worked at 40 stores usually worked because someone was watching every delivery. At 300, nobody can. More suppliers ship to more stores on more dates, and crews are booked back to back with no slack for a missed night. The questions to settle before the next wave:
- Who watches every delivery against its install date, not just its ship date?
- Where is equipment received and checked before it reaches the store?
- What happens to freight when a turnover date moves?
- Is each truck loaded in install order?
- How will you hear about a problem, and how early?
Keep what works
You don't have to rebuild a remodel program to protect it. Maybe you warehouse it yourself. Maybe vendors ship direct to each store. A checkpoint between the warehouse and the store catches a damaged case or a moved date before the crew is standing there. Start with one region, one wave or one equipment type.